01/03
Tatlipinar Enerji was put into operation in 2019 by intending to generate 100% renewable energy.
Located within the borders of Balikesir, Tatlipinar WPP set out by intending to generate 100% renewable energy. The WPP project, which was put into active operation in November 2019 with 5 turbines and a capacity of 19.5 MW, has achieved 362,5 MW installed power in the present.
02/03
We reduce our carbon footprint, and we work for a more livable world.
Thanks to the investments that we make in the renewable energy sources such as wind and solar, we reduce our carbon footprint, and we intend to leave a more livable world to the future generations.
03/03
Clean energy sustainable future!
As Tatlipinar Enerji, constituting a subsidiary of Agaoglu with a deep-rooted history of 43 years, we provide contribution to the renewable energy generation of our country by using the domestic and clean energy resources in the most efficient manner.